Rent for your Bonney Lake job
- Kubota U27-4R1 Mini ExcavatorTight-tail-swing mini excavatorFrom $335/dayBook the Kubota U27-4R1 Mini Excavator
- 7x14 Dump TrailerHaul dirt, gravel and debrisFrom $155/dayBook the 7x14 Dump Trailer
- 19 ft Scissor LiftIndoor ceilings, lighting, drywallFrom $150/dayBook the 19 ft Scissor Lift
- 30 ft Scissor LiftHigher ceilings, siding, warehouse workFrom $215/dayBook the 30 ft Scissor Lift
- Wire Pull Kit (Cannon 6K + 2 ropes + spool stands)Puller, two 300 ft ropes, spool stands. $1,250 deposit.From $245/dayBook the Wire Pull Kit (Cannon 6K + 2 ropes + spool stands)
- Cannon 6K Wire Puller (3K/6K)4-speed dual capstan, no anchoring. $1,000 deposit.From $175/dayBook the Cannon 6K Wire Puller (3K/6K)
- Pull Rope, 300 ft300 ft pulling rope. 2 available.From $30/dayBook the Pull Rope, 300 ft
- Wire Spool Stand Set (reel stands + spindle)Two reel stands plus spindle.From $35/dayBook the Wire Spool Stand Set (reel stands + spindle)
Free pickup in Pierce County; exact location sent after booking. Delivery is $200 each way; your job-site address is checked at checkout.
Common Bonney Lake jobs
Lake Tapps shoreline projects
Dock, bulkhead and beach work during the drawdown. See the drawdown guide. Kubota U27-4R1 Mini Excavator
Clearing and hauling
Move brush, stumps, rock and fill around wooded Plateau lots. 7x14 Dump Trailer
Garage and shop ceilings
High ceilings, lighting and siding without ladders. 30 ft Scissor Lift
Detached shop or ADU power
Pull feeders through conduit to an outbuilding. Wire Pull Kit (Cannon 6K + 2 ropes + spool stands)
Permits and inspections in Bonney Lake
Rules change. Confirm with the permit office before you start; these notes link the official pages.
Grading
Bonney Lake requires a Grade & Fill permit for excavation 5 ft or deeper or fill 3 ft or deeper involving 250 cubic yards or more, broadcasting 100 cubic yards or more of topsoil, mulch or bark, or creating 5,000 sq ft or more of impervious surface. Clearing without grading needs a Tree Removal / Clearing permit instead. City of Bonney Lake: Civil & Utility permits · Planning permits
Near Lake Tapps
The city says almost all work within its shoreline jurisdiction, generally within 200 ft of Lake Tapps, needs a shoreline exemption or permit, including docks, bulkheads, grading and retaining walls. City of Bonney Lake: shoreline work · Lake Tapps permit roadmap
Electrical
Electrical permits: Bonney Lake is not on L&I's list of cities that run their own electrical permits, so electrical permits and inspections there go through Washington L&I (check Tacoma Power's area first if you are unsure).
Digging
Before any digging, file a free utility locate request: call 811 or use WA 811.
Planning a dig? Read the mini excavator rental guide.
Pickup, delivery and prices
Free pickup in Pierce County; exact location sent after booking.
Delivery is $200 each way; your job-site address is checked at checkout.
Prices are before WA sales tax and the 1.25% heavy equipment rental tax where it applies. Your exact total shows at checkout. See all rates.
